Last Updated: 07/05/2022 Category: Roadway Current Phase: Complete
Construction to widen the remaining portion of Burnt Store Road to a four-lane roadway.
Last Updated: 07/05/2022 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Ainger Creek Boat Ramp Replacement
Last Updated: 06/30/2022 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.
Placida West Boat Ramp Expansion
Last Updated: 06/30/2022 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.South Gulf Cove Access Channel / Turn Basin Maintenance Dredge
Last Updated: 06/30/2022 Category: Coastal Current Phase: Turnover and Closeout
South Gulf Cove Access Channel / Turn Basin maintenance dredge permit and design project.