Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 12/19/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionLast Updated: 12/19/2024 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 12/19/2024 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 12/19/2024 Category: Roadway Current Phase: Design Development
Sandhill Blvd WideningVeterans Boulevard Intersection Improvements
Last Updated: 12/19/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Last Updated: 12/18/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIPLast Updated: 12/18/2024 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Caring Way and Brinson Avenue Sidewalks
Last Updated: 12/18/2024 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksLast Updated: 12/18/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.