Riverside Boat Ramp Replacement
Last Updated: 04/22/2024 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Supervisor of Elections Warehouse
Last Updated: 04/16/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Sheriff Administration and Hardened 911 Facility
Last Updated: 04/16/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Harold Avenue Generator Mitigation Grant
Last Updated: 04/16/2024 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.Last Updated: 04/15/2024 Category: Roadway Current Phase: Planning and Project Approval
Sandhill Blvd WideningBayshore Live Oak Park - West Fishing Pier
Last Updated: 04/15/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 04/15/2024 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayCharlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 04/15/2024 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 04/15/2024 Category: Sidewalks Current Phase: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview Road.