Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Fire Station 6 Replacement

Fire Station 6 Replacement Sales Tax Project

Last Updated: 04/30/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

Read More

G.C. Herring Park Phase I News Image

G.C. Herring Park Phase I Sales Tax Project

Last Updated: 04/30/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan. 

Read More

Mid-County Library Hurricane Repairs

Mid-County Library Hurricane Repairs

Last Updated: 04/30/2025 Category: County Facilities Current Phase: Construction

Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy. 

Read More

Old Landfill Road Safety Improvements

Old Landfill Road Safety Improvements Sales Tax Project

Last Updated: 04/30/2025 Category: Roadway Current Phase: Design Development

Old Loveland Rd safety improvements

Read More

Placida West Boat Ramp Expansion News Image

Placida West Boat Ramp Expansion Sales Tax Project

Last Updated: 04/30/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 04/30/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 04/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIP

Read More

Atwater Street Sidewalk

Atwater Street Sidewalk Sales Tax Project

Last Updated: 04/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 04/29/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More