Gillot Blvd & Blitman Waterway
Completed 12/31/2025 Category: Roadway
Gillot Blvd roadway reconstructionLast Updated: 12/31/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 12/31/2025 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 12/31/2025 Category: Roadway Current Phase: Design Development
Sandhill Boulevard WideningVeterans Boulevard at Atwater Intersection Safety Improvements
Last Updated: 12/31/2025 Category: Roadway Current Phase: Design Development
This project includes the design and construction of new turn lanes and traffic signal improvements at the intersection of Veterans Boulevard and Atwater Street.Veterans Boulevard Intersection Improvements
Last Updated: 12/31/2025 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Last Updated: 12/30/2025 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 35 culvert locations throughout the county that will have these grates installed.Last Updated: 12/30/2025 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 17 acres of Oyster Creek.Weir Inspection and Repair Design
Last Updated: 12/30/2025 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.