Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Sheriff Jail Admin Renovation (with Kitchen and Laundry) News Image

Sheriff Jail Admin Renovation (with Kitchen and Laundry)

Last Updated: 02/03/2026 Current Phase: Planning and Project Approval

 This project will renovate and modernize the Jail Kitchen and Laundry facilities to improve operational efficiency, user-friendliness, and compliance with commercial standards. Work includes redesigning the kitchen layout, upgrading equipment, evaluating options for relocating adjacent administrative space, and improving workflow within both the kitchen and laundry areas. The project will also address aged infrastructure and incorporate design solutions that enhance safety, functionality, and long-term maintainability within the facility.

Read More

South Gulf Cove Maintenance Dredge - Exterior

South Gulf Cove Maintenance Dredge - Exterior

Last Updated: 02/03/2026 Category: Coastal Current Phase: Planning and Project Approval

Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.

Read More

South Gulf Cove Parallel Locks Project News Image

South Gulf Cove Parallel Locks Project

Last Updated: 02/03/2026 Category: Coastal Current Phase: Planning and Project Approval

Engineering design project of the South Gulf Cove Parallel Lock.

Read More

Southwest Landfill Operations Building Zemel Rd News Image

Southwest Landfill Operations Building Zemel Rd

Last Updated: 02/03/2026 Current Phase: Planning and Project Approval

Read More

Tom Adams Bridge Emergency Repair - Hurricane Milton

Tom Adams Bridge Emergency Repair - Hurricane Milton Disaster Recovery Project Site

Last Updated: 02/03/2026

The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 02/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 02/02/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Burnt Store Drainage Study News Image

Burnt Store Drainage Study

Last Updated: 02/02/2026 Category: Drainage Current Phase: Planning and Project Approval

The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out.  The study will recommend conceptual improvements to alleviate this flooding.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 02/02/2026 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us