Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.
Disaster Recovery Projects DashboardLast Updated: 10/15/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Last Updated: 10/15/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIPAlligator Creek Maintenance Dredge
Last Updated: 10/15/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Atwater Street Sidewalk Project
Last Updated: 10/15/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Last Updated: 10/15/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 10/15/2025 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.Burnt Store Road East-West Connector
Last Updated: 10/15/2025 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 10/15/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksCharlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 10/15/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.