Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 09/06/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Building D Renovations

Building D Renovations

Last Updated: 09/03/2024 Current Phase: Design Development

Read More

Charlotte Harbor CRA - Melbourne Street multi-use path News Image

Charlotte Harbor CRA - Melbourne Street multi-use path

Last Updated: 09/03/2024 Category: Sidewalks Current Phase: Design Development

Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.

Read More

Charlotte Harbor CRA - Parmely Street road widening and sidewalk News Image

Charlotte Harbor CRA - Parmely Street road widening and sidewalk

Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.

Read More

Cochran Boulevard at Veterans Boulevard Intersection Improvments News Image

Cochran Boulevard at Veterans Boulevard Intersection Improvments

Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.

Read More

EOC Expansion

EOC Expansion

Last Updated: 09/03/2024 Current Phase: Planning and Project Approval

The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.

Read More

Gillot & Blitman Waterway

Gillot & Blitman Waterway

Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development

Gillot Blvd roadway reconstruction

Read More

Kings Highway Widening News Image

Kings Highway Widening

Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development

Widen Kings Highway to a 4 lane divided roadway

Read More

Landfill Scale House (Zemel Road) News Image

Landfill Scale House (Zemel Road)

Last Updated: 09/03/2024 Category: County Facilities Current Phase: Turnover and Closeout

The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us