Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 02/03/2026 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 02/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
Sheriff Jail Admin Renovation (with Kitchen and Laundry)
Last Updated: 02/03/2026 Current Phase: Planning and Project Approval
This project will renovate and modernize the Jail Kitchen and Laundry facilities to improve operational efficiency, user-friendliness, and compliance with commercial standards. Work includes redesigning the kitchen layout, upgrading equipment, evaluating options for relocating adjacent administrative space, and improving workflow within both the kitchen and laundry areas. The project will also address aged infrastructure and incorporate design solutions that enhance safety, functionality, and long-term maintainability within the facility.
South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 02/03/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
South Gulf Cove Parallel Locks Project
Last Updated: 02/03/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Southwest Landfill Operations Building Zemel Rd
Last Updated: 02/03/2026 Current Phase: Planning and Project Approval
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 02/03/2026
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Last Updated: 02/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP
Atwater Street Sidewalk Project
Last Updated: 02/02/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.