Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 09/06/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 09/03/2024 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 09/03/2024 Current Phase: Planning and Project Approval
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.
Last Updated: 09/03/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionLast Updated: 09/03/2024 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayLandfill Scale House (Zemel Road)
Last Updated: 09/03/2024 Category: County Facilities Current Phase: Turnover and Closeout
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.