Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 01/22/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 01/22/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 01/22/2026 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 01/22/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 01/22/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Last Updated: 01/21/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Peace River Shores Boulevard Railroad Crossing Enhancement
Last Updated: 01/21/2026 Category: Roadway Current Phase: Construction
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardRiverside Boat Ramp Replacement
Last Updated: 01/21/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 01/19/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.