Disaster Recovery Site - Ollie's Pond
Last Updated: 10/13/2025 Category: Disaster Recovery Site
Disaster Recovery Site - South Gulf Cove Access Channel
Last Updated: 10/13/2025 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways.Last Updated: 10/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, four pickleball courts, one basketball court, two sand volleyball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Last Updated: 10/08/2025 Category: Parks And Recreation Category: County Facilities Current Phase: Planning and Project Approval
McGuire Park Phase II amenities will include additional picnic pavilions, extended parking area, architectural fencing and community center.
Mid-County Library Hurricane Repairs
Last Updated: 10/08/2025 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 10/08/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction will include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 10/03/2025 Current Phase: Planning and Project Approval
Allapatchee Shores Park - Stormwater and Parking EnhancementsLast Updated: 10/03/2025 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Lakeview/Midway Wastewater Expansion
Last Updated: 09/17/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.