Swimming pool heat pumps only at a commercial or multifamily location.
Required Forms & Documents
- Application for Trade Permit (1 original signed): 3-page form
- Notice of Commencement (1 copy recorded): Any improvement for which the direct contract price is greater than $5,000. Must be submitted prior to scheduling the first inspection.
- Product Specifications: Product Approval Numbers for materials (e.g. windows, doors, roof covering, siding, soffits, etc.). Product approvals can be researched at floridabuilding.org/pr/pr_app_srch.aspx (FL#'s) or miamidade.gov/building/pc-search_app.asp (NOA #'s)
Fees
- Building Flat Fee: $90
- Surcharge: $4
Note: Payments by check should be made payable to either "CCBCC" or Charlotte County Board of County Commissioners. Payments are also accepted by Mastercard or Visa credit or debit cards.
Licenses That Can Pull This Permit Type
- Certified Master Plumber
- Certified Swimming Pool Class A
- Certified Swimming Pool Class C
- Registered Master Plumber
- Registered Swimming Pool Class A
- Registered Swimming Pool Class C
Department Reviews
-
Plumbing: Ensure that the proposed structure or component will comply with the plumbing provisions of the Florida Building Code.
Typical Inspections
- Electric Final (935): Made once power is connected to the building, all electrical work has been completed and all electrical trim is installed.
- Plumbing Final (975): Made after all plumbing work has been completed and all fixtures installed.