East Port Water Reclamation Facility Expansion
Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Hillsborough Boulevard Water Main Project
Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Lakeview/Midway Wastewater Expansion
Last Updated: 12/08/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Completed 12/05/2025 Category: Parks And Recreation
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Disaster Recovery Site - Fire Station 1
Last Updated: 12/05/2025 Category: Disaster Recovery Site
Storm-related damage includes exterior impacts to the building near the entrance and damage to a 30-foot aluminum flagpole.
Disaster Recovery Site - Fire Station 12
Last Updated: 12/05/2025 Category: Disaster Recovery Site
The roof, signage, and rear middle garage door sustained hurricane damage.Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.
South County Regional Park Improvements-Final Phase
Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Design Development
Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 12/04/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map and bridge pictures.