Disaster Recovery Site - Tippecanoe Environmental Park
Last Updated: 03/20/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged and removed environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Tringali Park
Last Updated: 03/20/2026 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 03/20/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Last Updated: 03/18/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Mid-County Library Hurricane Repairs
Last Updated: 03/18/2026 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 03/18/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Alligator Creek Maintenance Dredge
Last Updated: 03/17/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Completed 03/17/2026 Category: Bridges
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek
Completed 03/17/2026 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063