Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

South County Regional Park Playground Replacement

South County Regional Park Playground Replacement

Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Design Development

Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.

Read More

Waterway Hurricane Debris Removal-Grant Funded News Image

Waterway Hurricane Debris Removal-Grant Funded

Last Updated: 05/07/2026 Current Phase: Construction

Remove hurricane debris from approximately 37 miles of navigable waterways througout the county.

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 05/06/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.

Read More

Burnt Store Drainage Study News Image

Burnt Store Drainage Study

Last Updated: 05/06/2026 Category: Drainage Current Phase: Planning and Project Approval

The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out.  The study will recommend conceptual improvements to alleviate this flooding.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 05/06/2026 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Chamberlain Boulevard Sidewalk

Chamberlain Boulevard Sidewalk

Last Updated: 05/06/2026 Category: Sidewalks Current Phase: Design Development

NWPC Chamberlain Blvd. Sidewalk

Read More

Cleveland Avenue Sidewalk Project

Cleveland Avenue Sidewalk Project Sales Tax Project

Last Updated: 05/06/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 05/06/2026 Category: Sidewalks Current Phase: Construction

 Dorchester Street Sidewalk

Read More

Fruitland Avenue and Avenue of the Americas Sidewalk project

Fruitland Avenue and Avenue of the Americas Sidewalk project Sales Tax Project

Last Updated: 05/06/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout

Fruitland Avenue Avenue of the Americas Sidewalk

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us