Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 11/03/2025 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Last Updated: 11/03/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkHarbor Boulevard Intersection Improvements
Last Updated: 11/03/2025 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.
Old Landfill Road Safety Improvements
Last Updated: 11/03/2025 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvementsLast Updated: 11/03/2025 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.South Gulf Cove Bridge Rehabilitations
Last Updated: 11/03/2025 Category: Bridges Current Phase: Complete
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)Alligator Creek Maintenance Dredge
Last Updated: 10/30/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Ballfield LED Lighting Conversion-ACDRP Football Fields
Last Updated: 10/30/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-ACDRP Football FieldsBallfield LED Lighting Conversion-Carmalita Park Horse Arena
Last Updated: 10/30/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-Carmalita Park Horse Arena






