Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Cochran Boulevard Reclaim Extension
Last Updated: 12/06/2024 Category: Utilities Current Phase: Complete
Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard.Last Updated: 12/06/2024 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 12/06/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of a master plan through the park design process and phase 1 development.William R. Gaines Jr. Veterans Memorial Park
Last Updated: 12/06/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.Kings Highway Sidewalk and Bicycle Path
Last Updated: 12/04/2024 Category: Sidewalks Current Phase: Complete
Kings Highway Sidewalk and Bicycle Path.Last Updated: 12/04/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Complete
Marathon Boulevard PathwaySouth Gulf Cove Parallel Locks Project
Last Updated: 11/27/2024 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 11/26/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.East Port Water Reclamation Facility Expansion
Last Updated: 11/26/2024 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.