Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 09/24/2024 Category: Bridges Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map.
Last Updated: 09/23/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.East Port Water Reclamation Facility Expansion
Last Updated: 09/23/2024 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Lakeview/Midway Wastewater Expansion
Last Updated: 09/23/2024 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Last Updated: 09/23/2024 Category: Utilities Current Phase: Planning and Project Approval
This project includes extending sewer lines to provide service to certain developed properties within five project areas along the improved US 41 Corridor.
Last Updated: 09/20/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded.Last Updated: 09/20/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 09/20/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.NWPC Interior Canal Maintenance Dredge
Last Updated: 09/20/2024 Category: Coastal Current Phase: Turnover and Closeout
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.