Buena Vista Waterways Dredging Project
Last Updated: 11/18/2025 Category: Coastal Current Phase: Construction
Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU. The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.
Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 11/18/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 11/18/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
CR 771 Median Landscape and Irrigation Project
Last Updated: 11/18/2025 Category: Landscape Current Phase: Construction
CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.
Disaster Recovery Site - Ainger Creek Park
Last Updated: 11/18/2025 Category: Disaster Recovery Site
The site suffered significant waterfront and structural damage, including erosion, seawall displacement, and exposed mangrove roots. Several piers were damaged, along with the boat ramp, storm drain protections, and shoreline. Storm surges caused waterway fill, requiring dredging and reinforcement. Additional damage affected parking bumpers, containers, and signage.
Disaster Recovery Site - Allapatchee Shores Park
Last Updated: 11/18/2025 Category: Disaster Recovery Site
Erosion to the kayak launch and stormwater outfall areas. Stormwater outfall retention wall damage.
Disaster Recovery Site - Amberjack Environmental Park
Last Updated: 11/18/2025 Category: Disaster Recovery Site
The west boardwalk sustained major structural damage, requiring repairs to stanchions, handrails, bolts, and six deck piles.
Disaster Recovery Site - Anger Fishing Pier
Last Updated: 11/18/2025 Category: Disaster Recovery Site
The area sustained extensive pier damage resulting in total loss of approximately 4,300 sq ft. concrete, timber and composite fishing pier. Erosion of bulkhead and upland walkway with severe loss of rip rap revetment.
Disaster Recovery Site - Ann and Chuck Dever Regional Park
Last Updated: 11/18/2025 Category: Disaster Recovery Site
High winds and windborne debris damaged and removed playground shade(s), spectator shade(s) and environmental park boardwalk structures including stanchions, handrails, decking and support structures.