Mid-County Library Hurricane Repairs
Last Updated: 11/12/2025 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 11/12/2025 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 11/10/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 11/10/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvements
Last Updated: 11/10/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Disaster Recovery Site - Burnt Store Water Facility
Last Updated: 11/10/2025 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged many mechanical components and fencing to the Burnt Store Water Treatment Plant.