Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Fire Station 17

Fire Station 17 Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construction of a new 4 stall apparatus bay Fire Station on the NW corner of Tamiami Trail & Green Gulf Blvd at the Tuckers Grade intersection in Punta Gorda.

Read More

Fire Station 3 Replacement

Fire Station 3 Replacement Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

Read More

Fire Station 6 Replacement

Fire Station 6 Replacement Sales Tax Project

Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

Read More

Placida West Boat Ramp Expansion News Image

Placida West Boat Ramp Expansion Sales Tax Project

Last Updated: 08/28/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.

Read More

Cochran Boulevard Reclaim Extension News Image

Cochran Boulevard Reclaim Extension

Last Updated: 08/26/2025 Category: Utilities Current Phase: Complete

Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard. 

Read More

Willmington Boulevard Sidewalk

Willmington Boulevard Sidewalk

Last Updated: 08/25/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Willmington Boulevard Sidewalk

Read More

Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 08/22/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 08/22/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 08/22/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us