Disaster Recovery Site - Bayshore Live Oak Park
Last Updated: 02/05/2026 Category: Disaster Recovery Site Category: Disaster Recovery Site
The site experienced erosion and widespread damage to playgrounds, park amenities, boardwalks, sidewalks, pavilions, buildings, lighting, and fencing caused by storm surge, strong winds, flooding, and debris from multiple hurricanes.Peace River Shores Boulevard Road Crossing Pipe Replacements
Last Updated: 02/05/2026 Category: Roadway Current Phase: Construction
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardLast Updated: 02/05/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.Last Updated: 02/04/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 02/04/2026 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsKings Hwy Harborview Rd Intersection Improvements
Last Updated: 02/04/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 02/04/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Old Landfill Road Safety Improvements
Last Updated: 02/04/2026 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvements.Alligator Creek Maintenance Dredge
Last Updated: 02/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.








