Last Updated: 03/03/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 03/03/2026 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsGulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 03/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 03/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 03/03/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Old Landfill Road Safety Improvements
Last Updated: 03/03/2026 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvements.Last Updated: 03/03/2026 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed 03/03/2026 Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardPirate Harbor Maintenance Dredge - Exterior
Last Updated: 03/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.