Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs
Supervisor of Elections Warehouse
Last Updated: 06/12/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities.NWPC Interior Canal Maintenance Dredge
Last Updated: 06/06/2025 Category: Coastal Current Phase: Complete
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.Last Updated: 06/02/2025 Category: Coastal Current Phase: Complete
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.Bridgeless Barrier Islands Accessibility Study
Last Updated: 05/19/2025 Category: Other Current Phase: Complete
This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, goods, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, Don Pedro Island, and Knight Island/Thornton Key.Last Updated: 05/19/2025 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.Last Updated: 05/01/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2024 Road and Bridge Paving Program
Last Updated: 05/01/2025 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving Program2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 05/01/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.Gillot Boulevard Landscape and Irrigation Project
Last Updated: 04/23/2025 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.