Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Indian Trail/Springwater Dr Street Light Replacement

Indian Trail/Springwater Dr Street Light Replacement

Last Updated: 03/02/2026 Category: Roadway Current Phase: Design Development

Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old. 

Read More

Kings Highway Widening News Image

Kings Highway Widening

Last Updated: 03/02/2026 Category: Roadway Current Phase: Construction

Widen Kings Highway to a 4 lane divided roadway

Read More

Manatee Exclusion Grates

Manatee Exclusion Grates Disaster Recovery Project Site

Last Updated: 03/02/2026 Category: Disaster Recovery Site Category: Drainage

Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed.  These grates help prevent manatees from getting stuck in the culvert.  There are 37 culvert locations throughout the county that will have these grates installed.

Read More

Midway Boulevard Sidewalk (HB41)

Midway Boulevard Sidewalk (HB41)

Last Updated: 03/02/2026 Category: Sidewalks Current Phase: Planning and Project Approval

Midway Boulevard sidewalk and pedestrian bridge.

Read More

Myakka Park News Image

Myakka Park

Last Updated: 03/02/2026 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

Northwest Port Charlotte Maintenance Dredging - Exterior

Northwest Port Charlotte Maintenance Dredging - Exterior

Last Updated: 03/02/2026 Category: Coastal Current Phase: Planning and Project Approval

Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU.  The project may also include the Juno Waterway.

Read More

Peachland Boulevard at Harbor Boulevard Intersection Improvements News Image

Peachland Boulevard at Harbor Boulevard Intersection Improvements

Last Updated: 03/02/2026 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

Read More

Quesada Avenue Sidewalk and Pedestrian Signals

Quesada Avenue Sidewalk and Pedestrian Signals Sales Tax Project

Completed 03/02/2026 Category: Sidewalks Category: Sales Tax Funded

Quesada Avenue sidewalk and pedestrian signals

Read More

Rampart Boulevard Sidewalk Phase 1

Rampart Boulevard Sidewalk Phase 1 Sales Tax Project

Last Updated: 03/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

Rampart Boulevard Sidewalk Phase 1 

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us