Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

East Port Water Reclamation Facility Expansion News Image

East Port Water Reclamation Facility Expansion

Last Updated: 04/23/2024 Category: Utilities Current Phase: Construction

This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.

Read More

Placida West Boat Ramp Expansion News Image

Placida West Boat Ramp Expansion Sales Tax Project

Last Updated: 04/12/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.

Read More

Bridgeless Barrier Islands Accessibility Study News Image

Bridgeless Barrier Islands Accessibility Study

Last Updated: 04/12/2024 Category: Other Current Phase: Planning and Project Approval

This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, goods, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, Don Pedro Island, and Knight Island/Thornton Key. 

Read More

Lakeview/Midway Wastewater Expansion

Lakeview/Midway Wastewater Expansion

Last Updated: 03/21/2024 Category: Utilities Current Phase: Planning and Project Approval

This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system. 

Read More

Cape Haze Wastewater Expansion

Cape Haze Wastewater Expansion

Last Updated: 03/21/2024 Category: Utilities Category: Utilities Current Phase: Planning and Project Approval

This project proposes construction of a wastewater collection system to service approximately 500 properties with sewer service, new water service lines and a station that will provide sewer collection for the wastewater system. 

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 03/04/2024 Current Phase: Construction

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Fire Station 2 News Image

Fire Station 2

Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete

Design a new scalable fire station to replace the existing station.

Read More

Fire Station 5 News Image

Fire Station 5

Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete

Design a new scalable fire station to replace the existing Fire Station 5. The new station will be located along Burnt Store Road. 

Read More

Burnt Store Road East-West Connector News Image

Burnt Store Road East-West Connector

Last Updated: 01/17/2024 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.

Read More