Cleveland Avenue Sidewalk Project
Last Updated: 12/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Cochran Boulevard at Veterans Boulevard Intersection Improvements
Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
CR 771 Median Landscape and Irrigation Project
Last Updated: 12/02/2025 Category: Landscape Current Phase: Construction
CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Last Updated: 12/02/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 12/02/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map and bridge pictures.
Last Updated: 12/02/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkLast Updated: 12/02/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Fruitland Avenue and Avenue of the Americas Sidewalk project
Last Updated: 12/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Turnover and Closeout
Fruitland Avenue Avenue of the Americas SidewalkLast Updated: 12/02/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard Pathway



