Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Gasparilla Road Sidewalk (Boca Grande)

Gasparilla Road Sidewalk (Boca Grande)

Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development

This project was requested by the CCBOCC

Read More

Manatee Exclusion Grates

Manatee Exclusion Grates Disaster Recovery Project Site

Last Updated: 10/29/2025 Category: Disaster Recovery Site Category: Drainage

Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed.  These grates help prevent manatees from getting stuck in the culvert.  There are 35 culvert locations throughout the county that will have these grates installed.

Read More

Midway Boulevard Sidewalk (HB41)

Midway Boulevard Sidewalk (HB41)

Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Midway Boulevard sidewalk and pedestrian bridge.

Read More

Quesada Avenue Sidewalk and Pedestrian Signals

Quesada Avenue Sidewalk and Pedestrian Signals Sales Tax Project

Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Construction

Quesada Avenue sidewalk and pedestrian signals

Read More

Rampart Boulevard Sidewalk Phase 1

Rampart Boulevard Sidewalk Phase 1 Sales Tax Project

Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

Rampart Boulevard Sidewalk Phase 1 

Read More

Rampart Boulevard Sidewalk Phase 3

Rampart Boulevard Sidewalk Phase 3

Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development

Rampart Boulevard Sidewalk phase 3

Read More

Tom Adams Bridge Emergency Repair - Hurricane Milton

Tom Adams Bridge Emergency Repair - Hurricane Milton Disaster Recovery Project Site

Last Updated: 10/29/2025 Category: Disaster Recovery Site

The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 10/29/2025 Category: Drainage Current Phase: Design Development

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Willmington Boulevard Sidewalk

Willmington Boulevard Sidewalk

Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Willmington Boulevard Sidewalk

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us