Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 10/03/2024 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.South Gulf Cove Parallel Locks Project
Last Updated: 10/03/2024 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 10/01/2024 Category: Bridges Current Phase: Construction
Englewood East MSBU Bridge Rehabilitation - Bridges #014083, #014084, #014091, #014096, #014097Last Updated: 10/01/2024 Category: Bridges Current Phase: Complete
Englewood East/Gulf Cove MSBU's Bridge Rehabilitations Design Services- Bridges 014082 and 014088
Last Updated: 10/01/2024 Category: Bridges Current Phase: Design Development
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Midway Boulevard Bridge over North Spring Lake - Bridge #014073
Last Updated: 10/01/2024 Category: Bridges Current Phase: Design Development
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Last Updated: 10/01/2024 Category: Bridges Current Phase: Design Development
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045Last Updated: 10/01/2024 Category: Bridges Current Phase: Construction
Rotonda Bridge Rehabilitations Design #4 - Bridges #014101, #014104 and #014107
Last Updated: 10/01/2024 Category: Bridges Current Phase: Construction
Rotonda Bridge Rehabilitations Design #5 - Bridges 014060, 014063 and 014100