Midway Boulevard Sidewalk (HB41)
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.
Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Construction
Quesada Avenue sidewalk and pedestrian signals
Rampart Boulevard Sidewalk Phase 1
Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 1Rampart Boulevard Sidewalk Phase 3
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 10/29/2025 Category: Disaster Recovery Site
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Weir Inspection and Repair Design
Last Updated: 10/29/2025 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Willmington Boulevard Sidewalk
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkLast Updated: 10/28/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 10/28/2025 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham Boulevards